Monday, June 16, 2008

Maintenance List

Here's what's still to do...

  1. Replace boom sheaves and pin

  2. Seal/repot quadrant mount screws in cockpit sole to fix leak

  3. Repair/replace dodger weather cover

  4. Tie pegs to through hulls

  5. Annual service of winches

  6. Change oil and oil filter

  7. Change secondary fuel filter

  8. Buy size 12 hose clamps [done. 6/22/2008]

  9. Replace access panels in cockpit (backstay pump and emergency tiller) with plastic panels and latches

  10. Repair cockpit grate

  11. Enlarge hole in cockpit grate around manual bilge pump [done. 6/22/2008]

  12. Tighten lowers [done 6/29/2008]

  13. Move propane tank to stern locker [done. 6/16/2008]

  14. Varnish topside wood

  15. Clean bilge [done. 6/7/2008]

  16. Clean water tanks [done. 6/7/2008]

  17. Install CO and fire alarms [done. 6/22/2006]

  18. Install check valve for holding tank vent (how to stop water entering without blocking vent?)

  19. Rewire propane sniffer to main breaker

  20. Install sump pump for shower drain

  21. Seal leak at cockpit door threshold

  22. Seal leak(s) at fillers

  23. Seal leak at cockpit vent

  24. Sign up to bottom cleaner service [done. 6/28/2008

  25. Purchase bell

  26. Mount waste management plan [done. 6/1/2008]

  27. Lube rudder post

  28. Top up battery water [nothing to do. 6/22/2008]

  29. Send off spare heat exchanger for service

  30. Sort out a reefing system that works [done. See Wendy's method]

  31. Fix no AC to some outlets

  32. Get a good GPS solution

  33. Seizing for shackle pins

  34. Lube up furler [done. didn't help]

  35. Replace furler bearings

  36. Inspect/replace raw water impeller

  37. Inspect all hose clamps

  38. Inspect/replace engine electrical wiring

  39. Replace scummy fresh water hoses

  40. Repair/replace Lifesling bag

  41. Repair cockpit grate

  42. Through hull appears to have developed a trickle. Monitor. Replace at haulout.

  43. Find out what trashed the new halyard. Resplice.

  44. Shorten manual bilge pump hose to keep it away from float switch. [done. 6/22/2008]

  45. Fix wiring to compass light [done. 6/22/08]

  46. Add latches to cockpit lockers

  47. Add hook to keep refrigerator door open

  48. Remove disused cabling

  49. Add whipping to lines

  50. Add nylon grates to stern lockers

  51. Teflon lube all turnbuckles

  52. Install distribution panel and fuses for always-on items (bilge, fridge, propane)

  53. Install cable covers to DC wiring to inverter



Nice to haves....

  1. Check out spinnaker equipment

  2. Lead main halyard to cockpit

  3. Run traveller linesinto cockpit

  4. Windlass

  5. Wireless anemometer

  6. Larger propane tank

  7. Dry and paint bilge

2 comments:

smoothE said...

How many bells do you need? See item #18 and #26.

StuffinBox said...

Good point. Just one 8 incher. Fixed the list.